Monday, September 17, 2007

Dormer--DAY 3



Day 2 was mostly prep work for the big, big job of day three, which was putting in the 30' long, 18" thick beam that will carry the load from the new dormer and distribute it down the sides of the house and on to the foundation. This was a huge undertaking, and I wish I had photos of the acrobatics Dave and his helper had to go through to get this thing in place. I think he took some photos while they were doing it, and if I can get a hold of those, I'll post them here.

No comments: